
Walling of mansard floor

Covering the first floor with 12 meter long slabs

Walling the first floor

Walling of ground floor and covering

Making the first wall of the ground floor

The first brick in the wall of the administrative building

Everything is prepared for making walls

Ground work, waterproofing, building a cellar

Waterproofing (hydro-isolation) of a foundation

Finishing the montage of blocks for foundation

Second stage of the montage of blocks for foundation

All work as an one big family

Preparing bricks for construction

Making a place for foundation

Preparing materials for construction