CONSTRUCTION

Childrens playground
Well-Doer

2012
2011
2010
2009
2008
2007
2006
2005
2004
2008


Walling of mansard floor


Covering the first floor with 12 meter long slabs


Walling the first floor


Walling of ground floor and covering


Making the first wall of the ground floor


The first brick in the wall of the administrative building


Everything is prepared for making walls


Ground work, waterproofing, building a cellar


Waterproofing (hydro-isolation) of a foundation


Finishing the montage of blocks for foundation


Second stage of the montage of blocks for foundation


All work as an one big family


Preparing bricks for construction


Making a place for foundation


Preparing materials for construction


 

Fimiam Baptist Church 2012
Contact Information